Croydon Show - Saturday 4th and Sunday 5th October 2014 at Warlingham School, Tithepit Shaw Lane, Warlingham CR6 9YB.
Tolworth Showtrain - November 8th & 9th, Tolworth Recreation Centre, Fullers Way North, Tolworth, Surrey, KT6 7LQ.
The layout was displayed at my clubs exhibition last November as both a work in progress and a DCC layout. Although just a work in progress the layout got a lot of positive comments and attention being a local station. I'm pleased to say it performed very well with just a single point failure in the fiddle yard, which was over 30 years old from a childhood loft layout my father built. Being on the stage directly opposite the wonderful people at Invicta Models, a replacement set of points was quickly obtained and installed before the show opened.
The layout also attended our club room open day in May and I again spent most of the time talking to people about the layout or it's location, while fellow club members did sterling work keeping things moving. The old saying it's not what you know it's who you know also proved true. One of our visitors was not only extremely knowledgable about the London, Brighton lines and stations but very kindly provided me with some scans of plans for the goods shed I am intending to build. While I had taken a number of photographs of the existing goods shed at Burgess Hill the drawings will save me another visit with a tape measure.
Once the layout was set up at our open day, a club member brought down the Metcalfe terraced houses intended for a club layout. He placed these where the Victorian terrace houses are going to be, just to fill out the empty space awaiting scenery. The change was quite startling and really added to the layout, even though they were just dropped in. Therefore there has been a change of tack regarding layout progress and I am currently building card Kits of Victorian terraced houses for the road behind the head shunt and a couple of 1930's three bed houses for the right hand side of the board. These are only intended to be temporary until scratch built buildings have been completed. Once the card buildings are done there are a number of things that need completing including, building platform seats, fixing the station in place, repairing the line side fencing, finishing the corn field, lighting the canopy to see the figures and putting the pavement around the station. Only then can I start to consider starting the goods shed.
Hope to see you at one of the shows. Come and say hello.
No comments:
Post a Comment